Caltrans hosting virtual meeting on proposed replacement of U.S 101's Eureka Slough Bridges

Print
The Eureka Slough Bridges. Photo courtesy of Caltrans.

Caltrans invites you to participate in a virtual meeting on March 12 to discuss the proposed replacements of the Eureka Slough Bridges along U.S. 101 in northern Eureka.

The meeting will take place from 6 to 7:30 p.m. Tuesday, March 12.

Join the meeting at tinyurl.com/eurekasloughmeeting.

The project aims to replace the northbound and southbound Eureka Slough Bridges located near Target.

These replacements are intended to address seismic deficiencies and improve the function and geometrics of both bridges. The project involves replacing the existing bridges with two new, mirrored structures.

Each bridge will feature two traffic lanes, standard inside and outside shoulders, and a separated bicycle and pedestrian path on the outside edge.

The project is currently in the environmental phase and construction is targeted to commence in 2029.

For more information about the project, visit tinyurl.com/eurekaslough or email This email address is being protected from spambots. You need JavaScript enabled to view it..