The Lodge at Blue Lakes 707.275.2181





Lost Password?
No account yet? Register
www.inspirationsgallery.net
Shore Line Realty www.shorelineatthelake.com

Games

Arcade
Sudoku
Work under way on South Main Street PDF Print E-mail
Written by Harold LaBonte   
Saturday, 03 November 2007

Image
City crews are busy at work rebuilding parts of South Main Street. Photo by Harold LaBonte.



LAKEPORT – A street reconstruction project may slower drivers for the next few days.


Reconstruction of South Main Street between Lakeport Boulevard and the Social Security Office has drivers enduring lane closures as well as rough road surfaces.


A supervisor from Pavement Engineering Inc. indicated that the project is slated for completion early next week.


E-mail Harold LaBonte at This e-mail address is being protected from spam bots, you need JavaScript enabled to view it .

 

 

Image
Drivers will experience some delays until the project is complete next week. Photo by Harold LaBonte.
 

 

 

{mos_sb_discuss}

Trackback(0)
Comments (1)Add Comment
wanna bet?
written by smurf, November 03, 2007
I'd bet that this fresh asphalt lasts less than six months before the city or some utility chops-up the new road and does the usual crappy patch job on it. And could they find some way to get the concept into the old folks brains that the center lane is for MAKING TURNS, not for parking, passing or meandering around in? OK, part of one road done, that leaves what, another 50 to go? At this rate it should all be good by, um, I can't count that high.

Write comment
You must be logged in to post a comment. Please register if you do not have an account yet.

busy
Last Updated ( Saturday, 03 November 2007 )
 
< Prev   Next >
Sutter Lakeside Hospital
TwinPine Casino & Hotel Wine Country's Favorite Playground
www.dougrhoadesforda.com
Powered By Page_Cache by Ircmaxell
Generated in 0.84613108634949 Seconds